High pressure ASME and DOT tube units can be provided for a variety of on-site compressed gas storage needs. Different length new and reconditioned tube bundles can be built to fit a variety of site conditions. Units can be built to meet zone 4 building requirements. Units can be purchased or leased. Pressure and flow regulating manifolds are available. Installation and piping is available.